CITY ENGINEERING STANDARDS FOR CITY OF CLEARWATER
20181024 ensp 0183 enspdifference between original and final crosssections by the average end area method Sand silty sand or low plasticity clay soils with no organic content The Engineer shall The installation of any nonconductive mains and or services that will not extend in a straight line between